On Monday 25 July, demand averaged 29.6 GW. Renewables supplied 16%.
On Monday 25 July 2016, gas supplied 45% of Great Britain’s electricity and nuclear 26%. Demand peaked at 35.8 GW at 17:25. Wind generation peaked at 3.8 GW at 15:55. Solar generation peaked at 4.4 GW at 12:30. Gas made 50% of the electricity generated in Great Britain, compared with 45% across 2016.
Charts
No data for this period
No data for this period
Transfers · Mon 25 Jul
On Monday 25 July 2016, Great Britain imported 65 GWh and exported 1 GWh through its interconnectors. The most came from France (43 GWh).
Into Great BritainOut of Great Britain
Average0.00GWIdle
In 0.0 GWhOut 0.0 GWh
Average0.00GWIdle
In 0.0 GWhOut 0.0 GWh
Average1.80GWImporting
In 43.3 GWhOut 0.0 GWh
Average0.19GWImporting
In 5.4 GWhOut 0.7 GWh
Average0.67GWImporting
In 16.1 GWhOut 0.1 GWh
Average0.00GWIdle
In 0.0 GWhOut 0.0 GWh
Average0.17GWPumping
Generated 5.5 GWhPumped 9.5 GWh
All cards share one scale, so you can compare their heights. Each country can have more than one cable.
Download the 5-minute data for this day: CSV · JSON. See what the figures mean.