Electricity Live

Wind curtailment in Great Britain

NESO turned down 1,830 GWh of wind in the last 30 days, 20% of what Britain’s grid-scale wind farms could have made. It paid wind farms a net £51.6m to hold back.

ScotlandEngland THE B6 BOUNDARYScotland–England wiresfull on most windy days

Sunday 1 November 2026 · so far

0.6 GWh of wind turned down so far today

More than 99% of it was at Scottish wind farms. NESO paid the farms to hold back where the grid could not carry their power.

0.6GWhturned down
−£36knet cost
1%of possible grid-scale output

Most turned down that day

  1. 1Moray Eastoffshore0.4 GWh
  2. 2Seagreenoffshore0.1 GWh
  3. 3Neart na Gaoitheoffshore0.1 GWh
  4. 4Beatriceoffshore0.0 GWh
Wind turned down each dayPeak: Tue 27 Oct, 169 GWh

Every half hour

When the wind was turned down

Each row is a day, midnight to midnight, UK time. The darker the cell, the more wind NESO turned down in that half hour. The amber bar is the day’s net cost. Choose a row to show that day on the map.

Sunday 1 November (so far)0.6 GWh turned down−£36k net1% of possible grid-scale outputSee it on the map ↑
Net cost
£138k
£3.10m
£3.26m
−£146k
£0k
£184k
£3.15m
£5.07m
£167k
£981k
£5.42m
£5.69m
£1.83m
−£237k
£66k
−£465k
−£381k
£323k
£77k
£812k
£635k
£4.76m
£6.05m
£3.27m
£6.67m
£2.53m
−£507k
−£733k
−£60k
−£36k

Delivered and turned down

What grid-scale wind farms made, and what they could have made

The wind farms on the transmission network, which Elexon meters. Solid: wind that reached the grid. Hatched: wind that the farms were paid to hold back. The full bar is what the farms could have made.

DeliveredTurned down
0100 GWh200 GWh300 GWh400 GWh500 GWh357911131517192123252729311

Wind farms

The wind farms that turned down the most

“Full-output hours” is the energy turned down divided by the farm’s size: the hours that the farm could have run flat out. Point at a farm to find it on the map.

#Wind farmTurned downGWhFull-output hoursNet cost
1Seagreen
Offshore · 1,773 MW
364205£5.55m
2Moray West
Offshore · 860 MW
276321£5.62m
3Moray East
Offshore · 900 MW
255283−£6.05m
4Viking
Onshore · 487 MW
131269£2.24m
5Neart na Gaoithe
Offshore · 448 MW
103229£4.45m
6Beatrice
Offshore · 682 MW
87128£5.50m
7Stronelairg
Onshore · 324 MW
40124£3.39m
8Dorenell
Onshore · 228 MW
39171−£539k
9North Kyle
Onshore · 212 MW
31144£659k
10Limekiln
Onshore · 106 MW
28265£843k
11Aikengall
Onshore · 227 MW
28122£1.70m
12South Kyle
Onshore · 427 MW
2661£1.35m
13Gordonbush
Onshore · 145 MW
20140£1.08m
14Fallago Rig
Onshore · 144 MW
20140£1.70m
15Whitelee
Onshore · 515 MW
1836£1.65m
16Griffin
Onshore · 206 MW
1679£1.43m
17Kilgallioch
Onshore · 453 MW
1635£1.28m
18Crystal Rig
Onshore · 213 MW
1464£1.01m
19Bhlaraidh
Onshore · 108 MW
12110£1.00m
20Dunmaglass
Onshore · 100 MW
12119£1.08m

Archive

Every month

Wind turned down in each month, in GWh. The darker the cell, the more wind was turned down. Choose a month to see it day by day.

JanFebMarAprMayJunJulAugSepOctNovDec20261,2318471,4651,0675776085703871,8131,9500.6

Questions

Questions about wind curtailment

What is wind curtailment?

Wind curtailment is when NESO, the operator of Great Britain’s grid, pays wind farms to make less power than the wind allows. The usual reason is that the wires cannot carry the power to where people use it. The wind farm offers a price to turn down (a bid), NESO accepts it, and the farm turns down.

How much wind was turned down in the last 30 days?

NESO turned down 1,830 GWh of wind in the last 30 days, at a net cost of £51.6m. That is 20% of what Britain’s grid-scale wind farms could have made. With the small wind farms on local networks included (a NESO estimate), it is 18% of all the wind. The most in one day was on Tuesday 27 October: 169 GWh, at a net cost of £6.67m.

Why is most curtailment in Scotland?

More than 99% of the wind turned down in the last 30 days was at Scottish wind farms. Scotland has more wind power than it uses, and on windy days the wires that carry power south to England are full. The tightest point is the B6 boundary, the group of lines across the Scotland–England border. To keep supply and demand in balance, NESO then turns down wind in Scotland and turns up other power stations, often gas, in England.

Who pays for curtailment?

NESO pays the accepted bids and adds the cost to its balancing costs. Electricity suppliers pay those costs through the BSUoS charge and pass them on in household bills. Some wind farms with a Contract for Difference pay NESO to turn down instead, because they lose their subsidy when they do not generate. That is why the net cost of a day can be below zero.

Which wind farm was turned down the most in the last 30 days?

Seagreen, an offshore wind farm in Scottish waters. It turned down 364 GWh, as much as 205 hours at full output, at a net cost of £5.55m.

Why is the share for grid-scale wind farms only?

The share is the curtailment rate: the energy turned down divided by what the same farms could have made (their output plus the energy turned down). NESO turns wind down through the Balancing Mechanism, where grid-scale wind farms on the transmission network take part, and Elexon meters their output. Small wind farms on local networks cannot be turned down in this way, and only NESO estimates of their output exist. So the rate counts grid-scale farms on both sides, and the share of all wind is given for context.

Why do these figures differ from other sources?

Sources count different things. Some count every balancing action, and some count only the payments to wind farms for transmission constraints. Some wait for the final settlement. These figures are indicative, and they count each accepted bid on a wind farm that NESO flagged as a system action.

Source

The Elexon settlement bid stack: each accepted bid on a wind unit that NESO flagged as a system action. Wind delivered is Elexon’s metered transmission wind (FUELINST). Farm positions come from the government’s Renewable Energy Planning Database; offshore positions are set by hand.

How we count it

Turned down is the volume of the accepted bids. Net cost is the volume times the bid price. The figures are indicative: Elexon revises them for a day or two, and the final settlement comes weeks later. More about the method.

Limits

The share turned down counts grid-scale wind farms only, on both sides of the sum: NESO cannot turn down small farms on the local networks in this way. A few small farms have no known position, so they are in the table but not on the map. Contains BMRS data © Elexon Limited and public sector information licensed under the Open Government Licence v3.0.