Electricity Live

Wind curtailment in August 2026

NESO turned down 387 GWh of wind in August 2026, 8% of what Britain’s grid-scale wind farms could have made. It paid wind farms a net £5.96m to hold back.

ScotlandEngland THE B6 BOUNDARYScotland–England wiresfull on most windy days

Saturday 8 August 2026

74 GWh of wind, stopped at the border

More than 99% of this wind was at Scottish wind farms. The farms could generate this power, but the lines that carry power to England were full. NESO paid the farms to reduce their output.

74GWhturned down
£2.13mnet cost
31%of possible grid-scale output

Most turned down that day

  1. 1Seagreenoffshore21 GWh
  2. 2Moray Eastoffshore15 GWh
  3. 3Moray Westoffshore14 GWh
  4. 4Vikingonshore6.5 GWh
  5. 5Beatriceoffshore4.5 GWh
  6. 6Limekilnonshore1.7 GWh
Wind turned down each dayPeak: Sat 8 Aug, 74 GWh

Every half hour

When the wind was turned down

Each row is a day, midnight to midnight, UK time. The darker the cell, the more wind NESO turned down in that half hour. The amber bar is the day’s net cost. Choose a row to show that day on the map.

Saturday 8 August74 GWh turned down£2.13m net31% of possible grid-scale outputSee it on the map ↑
Net cost
£47k
£0k
£2k
£536k
£1.49m
£801k
£1.43m
£2.13m
£277k
£35k
−£67k
£73k
£0k
−£6k
£33k
£0k
−£82k
−£79k
−£133k
−£171k
−£115k
−£21k
£0k
−£196k
−£48k
−£73k
−£0k
−£14k
£78k
£0k
£33k

Delivered and turned down

What grid-scale wind farms made, and what they could have made

The wind farms on the transmission network, which Elexon meters. Solid: wind that reached the grid. Hatched: wind that the farms were paid to hold back. The full bar is what the farms could have made.

DeliveredTurned down
0100 GWh200 GWh300 GWh400 GWh1357891113151719212325272931

Wind farms

The wind farms that turned down the most

“Full-output hours” is the energy turned down divided by the farm’s size: the hours that the farm could have run flat out. Point at a farm to find it on the map.

#Wind farmTurned downGWhFull-output hoursNet cost
1Moray East
Offshore · 900 MW
117130−£1.70m
2Seagreen
Offshore · 1,773 MW
11062£1.54m
3Moray West
Offshore · 860 MW
5261£1.26m
4Viking
Onshore · 487 MW
3470£490k
5Beatrice
Offshore · 682 MW
1015£890k
6Neart na Gaoithe
Offshore · 448 MW
5.512£311k
7Limekiln
Onshore · 106 MW
4.846£145k
8Gordonbush
Onshore · 145 MW
3.323£150k
9North Kyle
Onshore · 212 MW
3.315£49k
10South Kyle
Onshore · 427 MW
3.07£144k
11Halsary
Onshore · 30 MW
2.688£30k
12Beinn an Tuirc
Onshore · 96 MW
2.627£29k
13Stronelairg
Onshore · 324 MW
2.68£217k
14Glen Kyllachy
Onshore · 52 MW
2.141£86k
15Walney Extension
Offshore · 1,189 MW
1.92£233k
16Creag Riabhach
Onshore · 93 MW
1.618£95k
17Sandy Knowe
Onshore · 87 MW
1.416£54k
18Corriegarth
Onshore · 69 MW
1.319£108k
19Clyde Central
Onshore · 200 MW
1.37£129k
20Clyde North
Onshore · 200 MW
1.26£112k

Archive

Every month

Wind turned down in each month, in GWh. The darker the cell, the more wind was turned down. Choose a month to see it day by day.

JanFebMarAprMayJunJulAugSepOctNovDec20261,2318471,4651,0675776085703871,8131,9500.6

Questions

Questions about wind curtailment

What is wind curtailment?

Wind curtailment is when NESO, the operator of Great Britain’s grid, pays wind farms to make less power than the wind allows. The usual reason is that the wires cannot carry the power to where people use it. The wind farm offers a price to turn down (a bid), NESO accepts it, and the farm turns down.

How much wind was turned down in August 2026?

NESO turned down 387 GWh of wind in August 2026, at a net cost of £5.96m. That is 8% of what Britain’s grid-scale wind farms could have made. With the small wind farms on local networks included (a NESO estimate), it is 7% of all the wind. The most in one day was on Saturday 8 August: 74 GWh, at a net cost of £2.13m.

Why is most curtailment in Scotland?

More than 99% of the wind turned down in August 2026 was at Scottish wind farms. Scotland has more wind power than it uses, and on windy days the wires that carry power south to England are full. The tightest point is the B6 boundary, the group of lines across the Scotland–England border. To keep supply and demand in balance, NESO then turns down wind in Scotland and turns up other power stations, often gas, in England.

Who pays for curtailment?

NESO pays the accepted bids and adds the cost to its balancing costs. Electricity suppliers pay those costs through the BSUoS charge and pass them on in household bills. Some wind farms with a Contract for Difference pay NESO to turn down instead, because they lose their subsidy when they do not generate. That is why the net cost of a day can be below zero.

Which wind farm was turned down the most in August 2026?

Moray East, an offshore wind farm in Scottish waters. It turned down 117 GWh, as much as 130 hours at full output, at a net cost of −£1.70m.

Why is the share for grid-scale wind farms only?

The share is the curtailment rate: the energy turned down divided by what the same farms could have made (their output plus the energy turned down). NESO turns wind down through the Balancing Mechanism, where grid-scale wind farms on the transmission network take part, and Elexon meters their output. Small wind farms on local networks cannot be turned down in this way, and only NESO estimates of their output exist. So the rate counts grid-scale farms on both sides, and the share of all wind is given for context.

Why do these figures differ from other sources?

Sources count different things. Some count every balancing action, and some count only the payments to wind farms for transmission constraints. Some wait for the final settlement. These figures are indicative, and they count each accepted bid on a wind farm that NESO flagged as a system action.

Source

The Elexon settlement bid stack: each accepted bid on a wind unit that NESO flagged as a system action. Wind delivered is Elexon’s metered transmission wind (FUELINST). Farm positions come from the government’s Renewable Energy Planning Database; offshore positions are set by hand.

How we count it

Turned down is the volume of the accepted bids. Net cost is the volume times the bid price. The figures are indicative: Elexon revises them for a day or two, and the final settlement comes weeks later. More about the method.

Limits

The share turned down counts grid-scale wind farms only, on both sides of the sum: NESO cannot turn down small farms on the local networks in this way. A few small farms have no known position, so they are in the table but not on the map. Contains BMRS data © Elexon Limited and public sector information licensed under the Open Government Licence v3.0.