All interconnectors
Mon 27 Jun- Imported
- 18GWh
- Exported
- 97GWh
- Net out
- 79GWh
- Average net flow
- 3.29GW out
Into Great BritainOut of Great Britain
On Monday 27 June, demand averaged 27.5 GW. Renewables supplied 32%.
On Monday 27 June 2022, gas supplied 45% of Great Britain’s electricity and wind 24%. Demand peaked at 33.7 GW at 16:25. Carbon intensity averaged 192 g/kWh and the price £195.70/MWh. Wind generation peaked at 11.7 GW at 00:00. Solar generation peaked at 6.7 GW at 14:30. Carbon intensity was lowest at 00:00 (139 g/kWh) and highest at 21:00 (222 g/kWh). The wholesale price ranged from £74.38/MWh at 00:30 to £304.33/MWh at 08:30. Gas made 47% of the electricity generated in Great Britain, compared with 41% across 2022.
Charts
Transfers · Mon 27 Jun
On Monday 27 June 2022, Great Britain imported 18 GWh and exported 97 GWh through its interconnectors. The most came from Ireland (9 GWh), and the most exports went to France (57 GWh).
Into Great BritainOut of Great Britain
Average0.87GWExporting
In 0.0 GWhOut 21.0 GWh
Average0.00GWIdle
In 0.0 GWhOut 0.0 GWh
Average2.36GWExporting
In 0.0 GWhOut 56.7 GWh
Average0.27GWImporting
In 8.6 GWhOut 2.0 GWh
Average0.36GWExporting
In 3.0 GWhOut 11.6 GWh
Average0.03GWImporting
In 6.4 GWhOut 5.6 GWh
Average0.17GWGenerating
Generated 8.0 GWhPumped 3.9 GWh
All cards share one scale, so you can compare their heights. Each country can have more than one cable.
Download the 5-minute data for this day: CSV · JSON. See what the figures mean.